Installation manual
Safety
xvi 975-0601-01-01 Revision B
This manual is for use by qualified personnel only.
16. After all measurements have been verified as 0 VAC:
a) Open, lock out, and tag out the CB3 control power circuit breaker.
b) Open, lock out, and tag out the CB4 auxiliary control power circuit
breaker (if external auxiliary AC power is installed).
Once the above procedure has been completed, the following tasks have been
accomplished: the external sources have been verified de-energized, locked
out, and tagged out; the Xantrex GT500 switches have all been opened, locked
out, and tagged out; and all hazardous voltages have been verified to have been
discharged. This completes the LOTO procedure.