Schneider Electric Owner's Guide
Configuration
2–2 975-0560-01-01 G
Configuring the Unit
Configure the charge controller using the Conext System Control Panel (SCP).
(Figure 2-1). See Appendix B, “Conext System Control Panel Menus” for an
overview of the SCP, or see the SCP Owner’s Guide (Document Part Number
975-0298-01-01).
In place of the SCP, you can also use the Conext ComBox. The ComBox allows
you to configure and monitor the charge controller using a web application on a
PC or laptop. For more information, see the Conext ComBox Owner’s Guide
(Document Part Number 975-0679-01-01).
Selecting a Unit
Before you can configure the charge controller’s settings, you must select the
charge controller’s device number in the SCP by performing the following steps:
1. On the System Status home screen, press Enter.
The Select Device menu opens.
2. Use the arrow buttons to scroll to the charge controller, and then press Enter.
The XW MPPT80 xx:Setup menu appears, where xx is the device number.
NOTICE
EQUIPMENT DAMAGE
Any configuration (change in settings) made when the Conext MPPT 80 600 is
in Operating mode will not be saved unless the MPPT is put in Standby and
then back to Operating mode. It is recommended to put the MPPT in Standby
mode prior to changing basic or advanced settings. Then return to Operating
mode for the settings to take effect.
Failure to follow these instructions can damage equipment.
Figure 2-1 Conext SCP
Standby
Event/Warning
Conext XW SCP
975-0560-01-01(XW-MPPT80-600_Ops).book Page 2 Wednesday, November 22, 2017 5:52 PM