Conext XW PRO 6848 6,800W 48V Manual
Table Of Contents
- Safety Information
- Label Symbols
- Radio Frequency Interference Notices
- Audience
- About
- Product Safety Information
- Introduction
- Pre-Installation Planning
- Wiring
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW Pro with a PDP
- Basic Functional Test – Single Inverter
- Wiring Additional Conext XW Pro units with a PDP
- Basic Functional Test - Multiple Inverters
- Wiring the Conext XW Pro Inverter/Charger without a PDP
- Communication
- Access Installation
- Specifications
- Wiring Diagrams
- Converting Split-phase to Single-phase
The neutral inputs are connected to each other, requiring only one neutral connection
when installed with a Power Distribution Panel (PDP). Without the PDP, additional
neutral connections may be required at the input sources.
Grounding AC Equipment
See "Torque Values for the Conext XW Pro" on page40 for torque values for the AC
terminal and AC ground bar. See"Torque Values for the Power Distribution Panel (PDP)"
on page40 for torque requirements for the ground bar in the Conext XW Pro Power
Distribution Panel.
Figure 31 AC Equipment Grounding With the PDP
Conext XW Pro Installation Guide Wiring
59 This manual is intended for use by qualified personnel 990-91228A-01