Installation Guide
975-0691-01-01 Revision B 2-7
2 Installation
Chapter 2 describes how to install, wire,
and connect the Battery Monitor to your
network. It includes:
• “Planning and Choosing a Location” on
page 9
• “Materials and Tools Required” on
page 10
• “Mounting the Battery Monitor” on
page 10
• “Mounting the Shunt” on page 16
• “Electrical Wiring” on page 16