Installation Guide

2-10 975-0691-01-01 Revision B
Materials and Tools Required
Materials List
The materials supplied with the Battery Monitor package are listed in the section
“Part List” on page 1–5.
The following materials and tools are not supplied but are required to complete
the installation:
CAT5 or CAT5e network cable(s) for Xanbus connections - 6.5 ft (2 m) or
longer
Wire stripper
Pencil
For panel mount:
Four #6 (or equivalent) mounting screws
Drill for pre-drilling
Diagonal cutter or heavy duty scissors
For wall mount:
Screwdriver set
For DIN rail mount:
35-mm “top hat” DIN rail (EN50022)
Diagonal cutter or heavy duty scissors
Mounting the Battery Monitor
The Battery Monitor can be mounted in 3 different ways as preferred:
Wall Mount using the two key-hole slots on the rear side to allow an easy mount
on two screws anchored into drywall (using provided drywall anchor screws) or
concrete wall. A wall mounting template is included in the
Conext Battery Monitor
Quick Start Guide (Part # 865-1080-01) included in the box.
Panel Mount using four mounting screws which are hidden after installation with
a snap-fit cover plate. A panel mounting template is included in the
Conext
Battery Monitor Quick Start Guide (Part # 865-1080-01) included in the box.
DIN Rail Mount using the included DIN rail clip which has a DIN rail mount latch
mechanism. This part is bundled with the Battery Monitor and is field-installable.
A 35-mm “top hat” DIN rail (EN50022) is required for mounting.