Additional Info
35mm
EN50022
D1
D3
D2
E1 E2
2
www.SEsolar.com
Conextâ„¢ Battery Monitor
865-1080-01
3.3mm
60mm
.
METSYS
BATTERY
Copyright © 2014 Schneider Electric. All Rights Reserved.
All trademarks are owned by Schneider Electric Industries SAS or its affiliated companies.
Install the Pre-Scaler board onto a wall with two screws (not included), as shown below.
Choose a location that is near the battery and easily accessible.
Install the battery shunt as close as possible to your battery location, using the two screws
included with the shunt; if possible, install the shunt inside your battery enclosure
NOTE: Ensure that terminals are covered after installation and wiring steps are completed.
Use the two screws provided to secure the shunt to your chosen location, as shown below.
The maximum allowable distance between the Battery Monitor and the shunt is 30m.
Panel Mounting
DIN Rail Mounting
Wall Mounting
Pre-Scaler Board Mounting Battery Shunt Mounting