Product Manual

Configuration via SCP
4–28 975-0638-01-01 Rev E
2. Set the load shaving amps.
3. Set the load shaving start and stop times.
4. Enable the grid-interactive delay feature.
In this scenario, load shaving is only entered and exited as programmed within
the time window (from 6 AM to 9 PM).
Additionally, with these scenario settings, the Conext SW would enter load
shaving within the configured time and also only if the battery has been charged
from an MPPT charge controller in Float (including Absorption) for 2 hours.
From AC Support -> Load Shave Amps
Press Enter, then select a value of 10 using
the up and down arrow buttons. Press Enter.
CSW4024 00: AC Support
AC Supp Mode
AC Supp Voltsp
Load Shave
Load Shave Amps
[Enabled]
[Disabled]
[Enabled]
[10A]
From AC Support -> LoadShaveStart
Press Enter, then a time of 9:00 PM using the
up and down arrow buttons. Press Enter.
Press Enter, then a time of 6:00 AM using the
up and down arrow buttons. Press Enter.
From AC Support -> LoadShaveStop
CSW4024 00: AC Support
LoadShaveStart
LoadShaveStop
AC Supp on Soc
AC Supp Start Soc
[6:00 AM]
[9:00 PM]
[Disabled]
[80%]
CSW4024 00: Adv Fea
StoreInvState
AcCouple
EnhancedAcSup
PLSDelay
[Disabled]
[Disabled]
[Disabled]
[Enabled]
CSW4024 00: Adv
Inverter Settings
Charger Settings
AC Settings
AC Support
Multi Unit Config
Restore Defaults
Adv Features
Go back to Advanced Settings -> Adv Features -> PLSDelay
Press Enter, then select Enabled using the up and down arrow
buttons. Press Enter.
NOTE: In the absence of an MPPT charge controller, charger block stop and
start settings must be set at the same times as the load shaving stop and start
settings. Otherwise, charging may start even during load shaving.
ConextSW-NA-OwnersGuide.book Page 28 Thursday, July 23, 2015 3:26 PM