Installation and Assembly
5897-__ __M PAGE 4 5897-__ __M PAGE 5
9 Hang upper mirror Chains "A" FIRST. Hook all Chains "A" into holes in the outer ring so that the metal accessories face outwards and square jewel is on the upper
end. Hook the loose end of Crystal Chains "A" with small jewels into holes of solid mounted metal ring.
10 Hook all chains "E" in the middle mirror plate (resting on temporary mounting) so that the metal accessories face outwards and square jewel is on the upper
end.(See page 6 for detailed instructions). Align notches in middle mirror plate with the permanent mounting, raise mirror plate over permanent mounting, then turn until
notches are halfway between permanent mounting. (See detailed drawing). Hook loose ends of chains "E" into solid mounted metal ring.
11 Hook all chains "F" in the lower mirror plate (resting on temporary mounting) so that the metal accessories face outwards and square jewel is on the upper end. (See
page 6 for detailed instructions). Align notches in lower mirror plate with the permanent mounting, raise mirror plate over permanent mounting, then turn until notches are
halfway between permanent mounting. (See detailed drawing). Hook loose ends of chains "F" into finial.
12 Hook prism "D" into fitting below finial.
E
Crystal Chain
has a small
jewel at bottom.
F
Crystal Chain
has a small
jewel at bottom.
A
Crystal Chain
has a small
jewel at bottom.
D
PERMANENT
MOUNTING
TEMPORARY
MOUNTING