User guide

SP-MCH2-BX-07A
SCH-200 MANUAL
R.D: Sept 2004
RL: 7
KH
Clearing Burner Screen:
- Make sure gas supply is off
- Use compressed air If air is not available on the site, aerosol can is available: Part # JH-0930-XX
- Insert air nozzle through the pilot lighting hole at side of mantle base
- Direct at flame retaining screen, and blow out any accumulated dust
- Re-open gas supply
- Re-light pilot, and continue using the construction heater as before.
Replace filter at least:
- once every 2 weeks
- minimum once a day when sanding drywall
- each time when connecting heater at different location
* Clean burner screen with each filter change;
( see next window )
Filter replacement:
- Shut off gas supply
- Grasp filter retainer and pull together at retainer grips
- Free filter retainer
- Remove and discard filter
- Replace with a new filter
- Reinstall filter retainer, complete with filter
FILTER RETAINER
FILTER
Page 6