TO BE COMPLETED BY THE LICENSED INSTALLER:
LOW INTENSITY START-UP
TYPE OF GAS: NG LP
DOES BUILDING HAVE A NEGATIVE CONDITION: YES NO
IS THIS A HIGH ALTITUDE AREA - (OVER 2000 FT ABOVE SEA LEVEL) YES NO
IF HIGH ALTITUDE WHAT IS THE ACTUAL ALTITUDE ABOVE SEA LEVEL FEET
DOES ENVIRONMENT REQUIRE FRESH AIR TO BURNER YES NO
IS HEATER EXPOSED TO CHEMICAL OR CORROSIVE ATMOSPHERE: YES NO
MINIMUM CLEARANCES ARE AS RECOMMENDED IN TABLE 3 YES NO
WILL HEATER BE AFFECTED BY OVERHEAD CRANES / VIBRATION YES NO
IS GAS SUPPLY LINE ADEQUATELY SIZED FOR SYSTEM VOLUME YES NO
GAS LINES AND BRANCHES HAVE BEEN PURGED OF AIR: YES NO
THIS HEATER WAS FIELD TEST FIRED WITHOUT ANY MALFUNCTION: YES NO
INLET GAS SUPPLY PRESSURE WITH HEATER OPERATING : WC"
GAS VALVE OUTLET (Manifold) PRESSURE WITH HEATER OPERATING: WC"
WHAT IS THE LINE VOLTAGE READING AT THE HEATER VOLTS
WHAT IS THE VOLTAGE READING AT THE IGNITION MODULE VOLTS
IS IT CONTROLLED BY A THERMOSTAT YES NO
IS THE THERMOSTAT STRATEGICALY LOCATED YES NO
WHAT IS THE TOTAL LENGTH OF THERMOSTAT WIRE FEET
WHAT IS THE GAUGE OF THE THERMOSTAT WIRE GAUGE
WHAT IS THE LENGTH OF THE HEATER (10ft per Tube) FEET
WHAT TOTAL LENGTH IS THE VENTING SYSTEM (add 10ft for each bend) FEET
WHAT LENGTH IS THE COMBUSTION AIR SUPPLY(add 10ft for each bend) FEET
IF REQUIRED....WHAT IS THE LENGTH OF THE TURBULATOR(S) FEET
IF INSTALLED....IS TURBULATOR AT VENT END OF SYTEM YES NO
DOES THE HEATER HAVE GOOD ELECTRICAL GROUNDING YES NO