User`s manual
Schilling Marking Systems GmbH
In Grubenäcker 1 DE-78532 Tuttlingen
+49 (0)7461 9472-0 +49 (0)7461 9472-20
info@schilling-marking.de
www.schilling-marking.de
  MK3 - User’s Manual  60 
 Maintenance 
6. MAINTENANCE 
6.1 Introduction 
The inspection consist of standard maintenance that can be done directly by the user, and of 
preventive and/or corrective interventions that can be carried out only by the Technical Service. 
As all the electric and mechanic appliances, this unit needs not only a correct use but also the 
maintenance and inspections at regular intervals. This care will grant a continuous and efficient 
operation of the marking system. 
6.2 Standard Maintenance 
This maintenance must be carried out periodically every 6 months assuming an use of 8 hours 
per day of the stamper. 
Lubricating the movements bars 
Remove the protection carter. 
Remove the dust in the interior of the equipment. 
Dampen a not abrasive cloth with vaseline oil (type for sewing-machine) and clean 
accurately the shafts. 
Pneumatic Group 
Dismount the air filter. 
Blow in by means of an air gun (max 6 atm.) in opposite direction of the normal 
operation. 
Verifying and adjusting the belt tension 
Apply a load of 150 gr. on the middle point of the belts between the pulleys and verify 
that the flexion is less of 5 mm. 
If not, adjust on both tensioning pulleys. 
Electrovalve 
Verify that the electrovalve silencer is not obstructed by dust. 
To access , unscrew the silencer and blow in by means of an air gun (max 6 atm.) in 
opposite direction of the discharge. 










