Labor Rate Book

Modular
Component Under
counter
Air or
Water
cooled
Remote
cooled
Eclipse
or
Remote
Low Side
Dispenser
or Bin
Time delay relay 1.5 ---1.5
Transformer 1.5 1.5 1.5 1.5 1.5
TXV / Expansion valve 4.0 4.5 5.0 6.0 3.5
Water distributor or spray platform 1.5 1.5 1.5 1.5 1.5
Water leak 1.5 1.5 1.5 1.5 1.5
Water level sensor 1.5 1.5 1.5 1.5 -
Water pump spray or drain 2.0 1.5 1.5 1.5 -
Water regulating valve 3.5 3.0 - - 3.0
Water seal with / without bearing 3.5 3.5 3.5 3.5 3.5
Notes:
Electrical components:
Maximum 3 hours for multiple replacements on one service call.
Refrigeration
Multiple Refrigeration Service: Up to the highest rate for the component changed, plus 1 hour more for
each additional refrigeration component.
Flaker/Nugget Mechanical:
* Evaporator and Gear Reducer Combination Replacement: Add 1 hour to evaporator rate for the gear
reducer.
Commercial Labor
November 2013, Page 6