Service Manual

Ice Bridge and Water Purge Adjustments
Bridge Thickness - For the Service Tech Only
1. Push and hold Off till the machine stops.
2. Remove evaporator cover.
3. Remove curtain.
4. Use a hex wrench and rotate the bridge
thickness adjustment screw in 1/16 turn
increments CW to increase bridge thickness.
Rotate CCW to decrease bridge thickness.
Caution: Do not make the bridge too thin or the
machine will not harvest properly. Bridge thickness
adjustments are not covered by warranty.
5. Return curtain and evaporator cover to their
normal positions.
6. Push and release the On button. Check next
harvest of ice. Repeat steps 1-6 if needed.
Water Purge Setting
The water purge is factory set to the automatic
position, suitable for most water conditions. The
setting can be changed to one of 5 manual settings
or left on automatic.
Purge setting
Setting Water Type
1 Minimum - RO water or equivalent
2 Moderate - Low TDS, non RO
3 Standard - Use with typical water
4 Heavy - High TDS
5 Maximum - Very high TDS
A Automatic - Factory setting
Any with conductivity not less than 10
microSiemens/cm
To set:
1. Switch the machine OFF by holding the Off
button in until a number or the letter A shows on
the display.
2. Press and release the On button repeatedly until
the number on the display corresponds to the
desired setting.
3. Press and release the Off switch again to return
to the normal control state.
Note: Indentations may be deeper on medium cube
models
Prodigy Eclipseรค 1200, 1400, 1800, 2000
August 2008
Page 27
Bridge Thickness Adjustment Mechanism
Ice Bridge Thickness Measurement
1/8-3/16"
bridge
Adjustment
Screw
Too Big
Too Small
Just Right