Service Manual

SCCG50 & SCCP50
Service Manual
June 2008
Page 11
Gravity Drain
Caution: Restrictions in the drain system to the
machine will cause water to back up into the ice
storage bin and melt the ice. Gravity drain tubing
must be vented, have no kinks and slope to the
building drain. Air gaps are typically required by
local code.
1. Place the ice machine in front of the installation
opening. Adjust leveling legs to the approximate
height.
2. Remove the front service access panel and the
upper back panel.
Note: If you are connecting a gravity drain model
and the drain opening has been located in the oor
under the base pan according to the pre install
specications, follow steps 3 through 5 to drain the
unit through the base. If not, proceed to step 6b.
3. Remove the clamp and barbed elbow and take
off the plastic cover in the base pan below the
drain hose.
4. Connect a straight 5/8” barbed connector to
the drain hose, securing with the clamp removed in
step 4.
5. Cut an 8” piece of 5/8” ID X 7/8” OD tygon
(clear plastic) tubing. Slide one end of the tube
onto the outlet of the barbed connector and secure
with a clamp. Leave the other end of the tube
lying on the oor of the base pan until the unit is
positioned over the oor drain.
6. Route the drain tube. Either a) Insert the drain
tube through the base pan into the oor drain or
b) Route the drain tube through the left hole in the
lower back panel and connect to barbed elbow and
secure with a clamp.
7. Reinstall the upper back panel.
8. Reinstall the service access panel. Level the
unit.
Back View, Gravity Drain Model
Drain Hose
Barbed Elbow
Drain Hose,
Route to
building drain
Water Inlet
Tube (eld
supplied)