Installation Guide
4
INSTALLATION INSTRUCTIONS
PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with 
package contents list and hardware contents list. If any part is missing or damaged, do not attempt 
to assemble the product.
Estimated Installation Time: 45 minutes (24 hours for adhesive to dry).
Tools Required for Installation (not included): Phillips screwdriver, utility knife or scissors, adhesive,
power drill with drill bit, measuring tape, level.
1. With 2 people, place the vanity on its back on 
 a flat, scratch free surface. Locate the Center 
 Support Leg (L) and screw into the base of the 
 vanity. Once complete, lift the vanity back up 
 into the upright position.
WARNING
Vanity (A) MUST be secured to the wall. 
Note: Clean area where the vanity (A) will 
be permanently located prior to beginning 
installation, ensuring the vanity (A) will not 
interfere with any water supply and drain 
lines once mounted.
2. With two people, carefully place vanity (A) 
 against the wall in its final location. Find and 
 mark locations of wall studs behind the 
 permanent location of vanity (A). 
 From inside vanity (A), drill hole through 
 vanity mounting area into wall studs. 
 Using mounting hardware (not included) 
 appropriate for your installation site, secure 
 vanity (A) to wall stud. If possible, secure 
 vanity (A) to two wall studs for increased 
 stability.
Note: Use preassembled levelers on feet of 
vanity (A) to level the item. Twisting the levelers 
counterclockwise will increase the height of vanity 
(A), twisting them clockwise will decrease it. 
2
1
A
1
L
A










