Installation manual

Blow the tubing clear to eliminate any chips or dust created by cutting.
Once you’ve installed ends ttings on the high pressure tubing, connect tubing to the High Pressure
Pump and Membrane using Te on tape to seal the threads.
Install the high pressure tubing from the Membrane to the port on the Control Panel labeled “H.P.
In.” Install end ttings per the “Swagelok High Pressure Fitting Installation” instructions. Connect
and tighten ttings.
Swagelok High Pressure Fitting Installation
Fully insert the tube into the tting and against the
shoulder; rotate the nut nger-tight. Fig. 1.
High-Pressure Applications and High Safety-Factor
Systems:
Further tighten the nut until the tube will not turn by hand
or move axially in the tting.
Mark the nut at the 6 o’clock position. Fig. 2.
While holding the tting body steady, tighten the nut one
and one quarter turns to the 9 o’clock position. Fig. 3. Note:
For 1/16, 1/8, and 3/16 in.; 2, 3, and 4 mm tube ttings,
tighten the nut three-quarters turn to the 3 o’clock position.
Sea Clear Watermakers™ Manual - Version 1.1-G Page 31