Installation manual

Setting The Pressure Relief Valve
Slowly increase pressure to 950 psi by turning the Pressure Adjustment Needle Valve on the Control
Panel clockwise.
Using an Allen wrench, adjust the pressure relief valve until it opens. You should see water ow into
the clear bypass hose and a slight drop in pressure on the Membrane Pressure Gauge.
Reduce pressure by turning the Pressure Adjustment Needle Valve counterclockwise to operating
pressure of 850 psi.
Verify output ow to 5 gallon bucket.
Let system operate, discarding water for 15 minutes before testing, checking one last time for leaks.
At the end of 15 minutes, ll 5 gallon bucket with product water.
WARNING: Be sure that the High Pressure Pump needle valve is turned fully counterclockwise
to the minimum PSI.
Sea Clear Watermakers™ Manual - Version 1.1-G Page 34