Installation manual

Once the pump has been mounted and the belt has
been installed, you’re ready to make the electrical
and plumbing connections for the High Pressure
Pump.
Fill the pump with 9.81 oz. ISO 100 - NA 30 weight
hydraulic oil.
Connect the [+] wire from the magnetic clutch to
the wiring harness on the Control Panel using 12-gauge tinned wire.
If the generator is not grounded to the [-] terminal of the battery, you will need to run an additional
wire from the pump to your [-] battery buss. (In most cases, this will not be required.)
High Pressure Pump Fittings
See “Swagelok High Pressure Fitting Installation” on page 29.
Sea Clear Watermakers™ Manual - Version 1.1-G Page 28