Operating instructions

31
BREAK-IN PERIOD
Engine
With BOMBARDIER-ROTAX
®
craft en-
gines, a break-in period is required be-
fore operating the engine at full throttle.
Engine manufacturer recommendation
is about 10 operating hours.
During this period, maximum throttle
should not exceed 3/4, however, brief
acceleration and speed variations con-
tribute to a good break-in. Continued
wide open throttle accelerations, pro-
longed cruising speeds and overload-
ing the engine are detrimental during
the break-in period.
To assure additional protection during
the initial engine break-in, it is recom-
mended to add BOMBARDIER-ROTAX
injection oil in the fuel tank for the first
full fuel tank filling only.
To add injection oil in the fuel, proceed
as follows:
Fill fuel tank with approximately 15 li-
ters (4 gal) of gasoline; then, add the
required quantity of injection oil in the
fuel.
Fill up fuel tank with gasoline. Do not
overfill.
NOTE: It is important to proceed in
this order to allow a proper mixing of
the oil in the gasoline. If oil is added
first in an empty fuel tank, fuel lines
will be filled up with injection oil lead-
ing in a no start condition of the en-
gine(s).
CAUTION: Remove and clean spark
plugs after engine break-in.
10-Hour Inspection
It is highly recommended that after the
first 10 hours of operation, the craft be
checked by an authorized dealer. This
inspection will also provide the oppor-
tunity to discuss the unanswered
questions you may have encountered
during the first hours of operation.
MODEL QUANTITY
LRV 1.67 L
The 10-hour inspection is at the ex-
pense of the craft owner.
smo2000-001b.fm Page 31 Tuesday, May 4, 1999 1:20 PM
www.SeaDooManuals.net