User manual ZLIN Z50 (120) SEAGULL JP-5500070

www.seagullmodels.com
5
HINGING THE RUDDER.
Glue the rudder hinges in place using the
same techniques used to hinge the ailerons.
INSTALL THE AILERONS CONTROL HORN.
Hinge.
2 sets.
3x40mm.
Wing
bottom.
M3 LOCK
NUT.
ALUMINUM WASHER.
ALUMINUM WASHER.
CONTROL HORN
M3 SCREW.
Epoxy.
Epoxy.
18mm.
Aileron control horn.
1) Locate the hardware necessary to install
the control horns for the ailerons.
2) Position the control horn on the bottom of
the aileron. You will see pre-drill hole 3mm for
the horn mounting screw on the aileron.
3) Place epoxy into hole. This will harden the
threads and prevent the crews from pulling
loose.
4) Thread a control horn end with aluminum
washer, lock nut until the top edge of the end is
18mm from the vase of the horn as shown.
3mm.
INSTALL ELEVATOR CONTROL HORN.
Install the elevator control horn using the
same method as same as the aileron control
horns.
2 sets.
3x35mm.