User Manual
GIANT SCALE P-47 RAZORBACK 50-61cc/EP ARF
Instruction Manual.
8
12.
Set the ap control at the transmitter to
the down ap position. Adjust the ap
travel at the transmitter until it matches
the control throws listed in this manual.
INSTALLING LANDING GEAR
Locate items necessary to install Sprin
Landing Gear.
16.
13.
14.
Fit the ap linkage cover into position.
Check the operation of the ap to make
sure the cover does not interfere with the
ap linkage.
Use canopy glue to attach the cover to the
wing. Use low-tack tape to keep the cover
in position until the adhesive fully cures.
15.
Trim the ap linkage cover using a hobby
knife and hobby scissors.
Epoxy.
11.