User Manual

GIANT SCALE P-47 RAZORBACK 50-61cc/EP ARF
Instruction Manual.
8
12.
Set the ap control at the transmitter to
the down ap position. Adjust the ap
travel at the transmitter until it matches
the control throws listed in this manual.
INSTALLING LANDING GEAR
Locate items necessary to install Sprin
Landing Gear.
16.
13.
14.
Fit the ap linkage cover into position.
Check the operation of the ap to make
sure the cover does not interfere with the
ap linkage.
Use canopy glue to attach the cover to the
wing. Use low-tack tape to keep the cover
in position until the adhesive fully cures.
15.
Trim the ap linkage cover using a hobby
knife and hobby scissors.
Epoxy.
11.