Owner`s manual

3
12. Route hose from tank to deck tting and secure with
hose clamp.
Note: The holding tank on the 711-M28 is designed
to withstand discharge by a properly operating
discharge pump.
Toilet Installation:
13. Push button on back of ush pedal, then pull ush
pedal cover away from pedal to expose water valve.
Remove plastic pedestal cover from toilet base.
14. Install the (4) 1/4-20 x 1-3/4" long studs in inserts on
the tank top.
15. Place oor ange seal on studs, aligning the studs
with bumps on seat. Note: “THIS SIDE UP” should
face upwards.
16. Place toilet on studs and secure with four washers
and four nuts.
5. Apply waterproof caulk around underside of thru-hull
vent tting.
6. Install thru-hull vent tting and secure snugly with
nut. Wipe off excess caulk with damp cloth.
7. Attach remaining end of vent hose to thru-hull
tting with hose clamp.
Dockside Discharge Fitting:
(not supplied by SeaLand)
8. Drill hole in deck directly above SeaLand toilet. Hole
location is determined by routing space and length
of hose.
9. Screw 1-1/2" FPT x 1-1/2" hose barb into bottom of
deck tting.
10. Apply waterproof caulk around deck hole and install
deck tting into 2-1/4" (57mm) hole with screws. Wipe
off excess caulk with a damp cloth.
11. Install 1-1/2" MPT x HUB adapter into discharge
tting on holding tank. If necessary, PVC cement
elbow and hose adapter or hose adapter only into
1-1/2" (38mm) adapter. Secure 1-1/2" (38mm) hose
to adapter with hose clamp.
INSTALLATION INSTRUCTIONS (cont’d)
or