User manual
General Information
myUTN User Manual 12
1.5 First Steps
This section provides all the information that you need for a fast
operational readiness.
Proceed as follows:
1. Read and observe the security regulations in order to avoid
damages to people and devices, see:
Ö11.
2. Carry out the hardware installation. The hardware installation
comprises the connection of the UTN server to the network, the
USB device and the power supply; see: 'Quick Installation
Guide'.
3. Make sure that an IP address is stored in the UTN server; see:
Ö13.
4. Install and start the software tool 'SEH UTN Manager' on your
client; see: Ö20.
5. Add the devices that you want to use to the selection list; see:
Ö63.
6. Activate the connection between the client and the USB device;
see: Ö64.
ª The connection will be established. The USB device can be used
by the client.