User's Manual

Selex ES S.p.A.
Information contained in this document may not be used, applied or reproduced for any purpose unless agreed
by Selex ES S.p.A. in writing
17
M6 screws
Customer-supplied cabinets and racks must have mounting rail and hole spacing compatible with EIA
Universal 48.3 cm (19 inches) specifications. Cabinets must provide adequate ventilation and must
meet the following criteria:
45.0 cm (17.71 inches) deep
48.3 cm (19 inches) wide
13.4 x 3 cm (15.75 inches) high
Two mounting rails 5 cm (2 inches) from front cabinet with front mounting holes 5.7 cm (2.25
inches) apart (center to center).
The front of the device is provided with four holes for M6 screws (highlighted above in green) for each
level. This permits to fasten the device to a 19” rack by means of 4 M6 screws for each level.
If several devices are installed in a single cabinet, be sure equipment have to be spaced at least by
1/2 RU (2,2 cm, 0,8 inches).to allow for adequate cooling.
Cabinets must have a least 15 cm (6 inches) of open space between the air vents and any wall or
other cabinets. This allows adequate air flow.
When multiple cabinets (each equipped with several repeaters) are installed in an enclosed
area, ensure appropriate ventilation and consider air conditioning or other climate control
equipment to satisfy the temperature requirements.