User's Manual

Revision 21.2 Gateway Installation and User Manual 6
3 Installation Checklist
3.1 Overview
This checklist will serve as a set of requirements and guidelines to fulfill the on-site equipment testing
and handling requirements set forth by Senet Inc. Changes or modifications to the gateway equipment,
including the top and bottom kit, the antennas and filters, not expressly approved by Senet could void
the user's authority to operate this equipment. Regular installation procedures may be followed in
conjunction with these procedures. Please initial all steps when complete, scan and email this
completed checklist to Network Operations at Senet, Inc.
3.2 Installation site details
3.3 Ground Test
To be performed on site prior to tower installation.
If the lower box will be using a cellular connection, AND will be mounted indoors, place
it indoors where it will be mounted. This is to verify that the cellular internet
connection is suitable inside of the building. Otherwise, lower box may be located
anywhere for ground test.
Connect spool of cable to both upper box and lower box. Ensure that connector is fully
latched and properly secured. Both ends of cable will be exposed, so cable may stay
spooled up for this.
Connect bandpass filter to N-type mating connector on top box. Bandpass filter is
bidirectional, so either end will work.
Connect lightning arrest/jumper cable to bandpass filter. This jumper is bidirectional, so
either end will work.
Connect lightning arrest/jumper cable to antenna.
If an on-site hard wired internet connection is available and authorized, connect a
standard Ethernet cable from Ethernet port on outside of lower box, to internet switch,
router, or modem. If this connection is not available, the box is already configured for a
cellular internet connection, and no hard internet connection is required.
Connect lower box power cable directly to a standard 120v outlet or with an extension
cord. Use a flathead screwdriver to open lower box. Ensure that lights are flashing
inside the box to verify power. If no lights are seen, flip tandem circuit breakers located
in the top left corner of the box on (red). Once powered up, it will take about two to
five minutes for the gateway to begin communication with our server.
Call Senet, Inc. Network Operations to verify network connectivity.
Once Senet gives the go ahead, proceed with installation.
Installation Company:
Tower ID: