Installation Guide

Table Of Contents
SPP Installation Procedures
Access Point Controller Card (APCC) 27
Sensys Networks, Inc. Installation Guide
N
OTE
:
Figures in this section depict only one of the bushings. The procedures apply equally to
either bushing.
Figure 6.5. Components used with the hex-head bulkhead connector
Step-by-Step Procedures
1. Remove the factory installed hex-head cap from the bottom of the SPP and set
it aside. The cap may be discarded after the cable has been completely
connected.
Figure 6.6. Remove the factory-installed cap
2. Carefully inspect the factory installed gasket seated on the bulkhead connector.
Ensure the gasket is seated smoothly and uniformly on the connector with the
ridged edge of the gasket facing outward.