Installation Guide
24
Zone 1 Theleadingedgeofthegate&catchpost.
Zone 2 Areabetweenthegateandhingepost.
Zone 3 Thearcofthegateorgatepath.
Zone 4 Thespacebetweenthegatewhenopenandanyobstructionsuchasfence,wall,
landscaping,etc.
Zone 5 Thepointwheretwobi-partinggatescometogetherwhenclosing.(Notshownbelow)
Everyinstallationisuniqueanditistheinstaller’sresponsibilitytorecognizeandremedyallsafety
concerns.Pleaseconsultaqualieddealerorthefactoryforacompleteexplanationoftheremedies
shownaboveandadditionaltipspertainingtoyourinstallation.
Allgateoperatorsrequireperiodiccheckingandadjustmentsofthecontrolmechanismforforce(load),
speedandsensitivity.Allaccessoriesandsecondarysafetydevicesmustbechecked.Secondarysafety
devicesneedtobecheckedatleastonceamonthforproperoperation.
Periodiccheckingisalsoadvisedforthefollowing:
1. Batteryterminalsforcorrosion,cleanwithbakingsodasolution.
2. Hingesandpivotpointsneedtobegreased.
3. Mountingboltsforcorrecttightness.
4. Inspectweldpointsforcracksorotherdefects.
5. Inspectwiringforcuts,nicksorotherdefects.
6. Inspecthingeposttoensureitisnotmovingortwisting.
7. Verifychargedeviceforproperoperation.Refertochargecontrolleroperationcheck.
8. Verifymonthlythattheinsideofthecontrolcabinetremainscleanandfreeofinsects.Donotspray
controlboardwithbugsprayoroilbasedproducts.
9. Openingorclosingtimeshouldbeapproximately16seconds.Ifthetimebeginstoincrease,the
battery needs to be tested.
ENTRAPMENT ZONES
PERIODIC SERVICE