Installation Guide
17
Connect Charge Device to Charge Controller
(TransformerorSolarPanelKit)
TheSentrygateopenerchargecontrolleracceptsinputsfrom
eitherthesuppliedACtransformerortheoptionalsolarpanel.
ThetransformerandsolarpanelcomewithaDCplugforeasy
installation.Oncethechargedeviceisselectedandinstalled
connecttheDCplugintothechargecontroller“PowerIn”located
intheupperrightcornerofthechargecontroller.
If charge device cable needs to be extended to reach the
charge controller see appendix B of this manual.
Charge Controller Operation Check
Oncethechargedeviceispluggedintothechargecontrollerverifythefollowing:
Transformer:
1. Chargelightashesfor3secondsandgoesoff
2. Externalpoweranddetectionlightscomeon
3. Detectionlightstaysonfor3seconds,thencharginglightcomeson
Solar Panel:
1. Chargelightashesfor3secondsandgoesoff
2. Solarpoweranddetectionlightscomeon
3. Detectionlightstaysonfor3seconds,thencharginglightcomeson
IfExternalPowerorSolarPowerLEDisonandtheDetectionLEDison,thebatteryisnotconnected
tothecharger.VerifyRed/Blackconnectorsarepluggedintothebottomofthechargerasshown
above.
NOTE: Most batteries will not be completely charged when rst connected and the charging
light should come on when charge controller is rst connected. The fully charged light will
come on once battery is fully charged.
Whenusingasolarpanel,thechargecontrollerisdesignedtoonlychargethebatterywhenthere
isenoughsuntodoso.Ifthereisnosun,thelightsonthechargecontrollershouldbe“OFF”.This
featurereducesthedrainonthebatteryinsolarinstallations.Iftransformerisinstalledlightsare
operationalallthetime.
Charge Device
plugs in here
13
14