INTRODUCTION
RECOMMENDED DESIGN FLOW
4 PROPRIETARY MODULE INTEGRATION GUIDE
SEQUANS Communications
1.2.4 Optimization
When the design returns from the manufacture, it might occur that
improvements have to be made to the circuits. It is also recommended to
communicate such results to Sequans who can help to verify the
implementation.
1.2.5 Functional Validation
The test of the design performance should be done in thorough detail. This
will ensure the compliance with the test standard as the final design will be
subjected to a formal qualification. It is the designer’s responsibility to meet
this goal. Sharing the results with Sequans will help identify any particular
problem that could be fixed at an early stage to ensure strong confidence of
qualification. This should be done for all the tests that involve Sequans
chipsets.
Hardware Test Preparation on page 37 provides you with the hardware setup
required to proceed with test phases.
1.2.6 Manufacturing Recommended Process
Manufacturing Process on page 5 provides information on the process
required to achieve the manufacturing of your product.