User Manual
Serengeti-IR
™
Installation, Operation & Service
Combustion Research Corporation Page 17
INSTALLATION PROCEDURE
The P/N 0367.00 side shield to be used on P/N 0812.00
panel reflectors and P/N 0366.00 side shield is for use on
the P/N 0363.00 Reflector. This side shield may be
installed on either side of the reflector. Refer to the layout
plan and clearance to combustible chart on the preceding
page for proper location.
Install one ten-foot side shield in conjunction with each ten
foot section of reflector so that overlap joints align.
Cut a suitable relief notch for every reflector hanger and
support.
The side shield is to be fastened to the reflector with #8 self
drilling and tapping screws, one near each end and
approximately one every two feet. The side shield
expansion joint must match the reflector expansion joint.
DO NOT SCREW THE EXPANSION JOINTS TOGETHER.
REFLECTOR
SUPPORT
TUBE & REFLECTOR
HANGER
REFLECTOR
SUPPORT
FIELD FABRICATED
RELIEF NOTCHES
SIDE SHEILD
Field fab relie
f
notch in side
Secure with
S/M scre
w
Secure side
shield
hanger with
S/M screw
Secure side
shield support
P/N (0366.0050)
to tube with S/M
scre
w
0366.00
Side shield
0363.00 REFLECTOR & 0366.00 SIDE SHIELD
Field fab relief
notch in shield
Secure with S/M scre
w
Secure side
shield hanger
with S/M screw
Secure side shield
support (P/N 0368.0010)
to tube with S/M scre
w
P/N 0367.00
Side shield
0812.00 REFLECTOR & 0367.00 SIDE SHIELD
SIDE SHIELD INSTALLATION