01672-RevE_102813_ENGLISH MODEL: CSP CHILLED SERVER WITH PUMP1 OUNCE CHILLED SERVER WITH PUMP2 OUNCE 94060 94050 230V Continental Europe Series 12G 230V Continental Europe Series 12G 230V Australia Series 12G 230V Australia Series 12G 230V United Kingdom Series 12G 230V United Kingdom Series 12G PUMP, CSP-1 OZ PUMP, CSP-2 OZ 94040 94140 120V Series 12G 94142 94143 94144 Series 12G EZ-CREAM 5/16 OUNCE 120V Series 13E 94160 PUMP, CSP-5/16 OZ, EZ-CREAM Series 13E 94150 120V Series 12G 94
SAFETY GUIDELINES WHEN USING THIS UNIT: C E Warning- Electrical shock could occur: • This unit must be earthed or grounded. • This requires all three prongs (terminals) on cord plug to be plugged into power source. According to food and safety regulations, most foods must be stored and/or served at certain temperatures or they could become hazardous. Check with local food and safety regulators for specific guidelines.
UNIT TAKE-DOWN 1 PRESS SWITCH TO “OFF” POSITION. 2 UNPLUG CORD. 3 REMOVE PUMP. 4 REMOVE PRODUCT VESSEL. SEE SEPARATE PUMP MANUAL FOR PUMP INSTRUCTIONS. CHANGING OR CLEANING FILTER FOR BEST UNIT COOLING AND PERFORMANCE, CHANGE OR CLEAN FILTER AT A MINIMUM OF ONCE PER MONTH. 1 SEE UNIT TAKE DOWN. 2 ENSURE UNIT IS “OFF” AND UNPLUGGED. 3 TURN UNIT OVER TO ACCESS FILTER HOLDER AND FILTER ON UNDERSIDE OF UNIT. 4 LIFT OFF FILTER HOLDER BY PULLING IT OFF FROM ONE EDGE.
PUMP DISASSEMBLY BEFORE FIRST USE AND AFTER USE DAILY, DISASSEMBLE AND CLEAN PUMP. IMPORTANT PUMP AREAS TO CLEAN: CLEAN ALL SIDES OF STAINLESS STEEL BALLS CLEAN VALVE BODY PASSAGEWAY CLEAN VALVE BODY OPENINGS 1 PUMP OUT ALL (IF ANY) REMAINING FOOD PRODUCT FROM INSIDE PUMP BODY. 2 WASH AND RINSE OFF OUTSIDE OF PUMP BODY. 3 FLUSH OUT AND RINSE THROUGH INSIDE OF PUMP.
CLEAN-IN-PLACE PROCEDURE FOR PUMPS CLEAN-IN-PLACE IS A BASIC FOUR STEP PUMP FLUSHING PROCESS: CLEAN, RINSE, SANITIZE, AND RINSE. CLEAN: 1 PUMP OUT ALL (IF ANY) REMAINING FOOD PRODUCT FROM INSIDE PUMP. 2 WASH AND RINSE OFF OUTSIDE OF PUMP. 3 FLUSH OUT AND RINSE THROUGH INSIDE OF PUMP. • Place lower end of pump into container full of water and operate pump until all (if any) remaining product is expelled and only warm water flows from discharge tube.
a a cone washer valve cover VALVE COVER ASSEMBLY a INSTALL CONE WASHER INTO VALVE COVER. b INSTALL VALVE COVER, WITH CONE WASHER INSIDE, ONTO DISCHARGE TUBE THREADING. c ROTATE VALVE COVER CLOCKWISE TO SECURE TO THREADS OF DISCHARGE TUBE. Do not use any sharp tools for assembly, this can damage parts. b VALVE COVER ASSEMBLY c a b UNIT TROUBLESHOOTING PUMP TROUBLESHOOTING POSSIBLE SOLUTIONS: PROBLEMS WITH PUMP OPERATION AND/OR FLOW: • Clean pump. POSSIBLE PROBLEM: • Unit does not cool.
PUMP ASSEMBLY BEFORE FIRST USE AND AFTER USE DAILY, DISASSEMBLE AND CLEAN PUMP. ASSEMBLE PLUNGER: 1 INSTALL SEAL O-RING INSIDE SEAL. • Apply food equipment lubricant on seal o-ring. 2 INSTALL SEAL ASSEMBLY ONTO PISTON HEAD. • Apply food equipment lubricant inside seal assembly. 3 INSTALL WASHER ONTO THREADED END OF PISTON. 4 INSTALL SPRING ONTO THREADED END OF PISTON. 5 INSTALL HEAD INSERT INSIDE HEAD TUBE. • Beveled edge of head insert should be facing inside of head tube.
UNIT CLEANING BEFORE FIRST USE AND AFTER USE DAILY, DISASSEMBLE AND CLEAN UNIT AND PUMP. STAINLESS STEEL PARTS CAN CORRODE. IT IS IMPORTANT TO CLEAN, RINSE, SANITIZE, AND DRY THESE PARTS DAILY AND PROPERLY. FAILURE TO COMPLY WITH ANY OF THESE INSTRUCTIONS MAY VOID UNIT WARRANTY. 1 SEE UNIT TAKE DOWN, PUMP DISASSEMBLY, AND PUMP CLEANING. 2 ENSURE UNIT IS “OFF” AND UNPLUGGED. C E Warning- Electrical shock could occur: • Electrical components of unit could be damaged from water exposure or any liquid.