User guide
Virtual Connect modules  222 
•  The VCM configuration, module types, and cabling configuration must be the same before and after the 
upgrade. 
•  The VCM credentials must be the same before and after the upgrade. 
•  Do not perform a downgrade if servers are powered on or if a server profile migration operation has 
been performed since the upgrade. Performing a downgrade under these conditions can result in 
duplicate MACs/WWNs in the domain. 
•  If the VC domain is managed by VCEM, be sure that the domain configuration has not changed, 
including the profile configuration, since the upgrade. Changes to the domain might require that you 
resynchronize VCEM to the domain or remove the domain from the VCDG. Changes to the profile 
configuration can result in duplicate MAC/WWN identifiers. 
Stacking Links screen 
To access this screen, click the Stacking Links link in the left navigation tree. 
Be sure to connect any Ethernet module stacking cables before running the network setup wizard. 
IMPORTANT: For a Virtual Connect environment to operate properly, all VC-Enet modules within 
the Virtual Connect domain must be interconnected with stacking links. HP strongly recommends 
that redundancy be maintained in stacking links to ensure continued connectivity of servers to the 
external networks. 
This screen enables you to determine whether all stacking cables are properly installed so that all VC-Enet 
modules within the domain are interconnected: 
•  Connection Status indicates whether all of the VC-Enet modules within the domain are interconnected 
with stacking cables and accessible. Lack of connection status to all VC-Enet modules results in a critical 
alert. 
o  OK indicates that all modules are connected. 










