Installation Guide

19
4. Install The First Row
Note: If your project is framed on 3 or 4 sides, complete
Steps A thru K. If your project is framed on 2 sides, skip
to Step L.
A. Using a trowel apply
approximately a 1/2"
mortar bed to
the treated
curb or
oor.
B. Without applying any mortar to the rst block, place
an “L” spacer at the lower outside corner of the
block so that the spacer cross arm will be at the
bottom, between the glass block and the curb.
C. Place a “T” spacer at the other lower corner of the
block with the spacer cross arm up.
D. Slip a 16" long piece of trimmed expansion
strip between the block and jamb, and push
theblockrmlyintoplace.
E. Slip a “T” spacer between
the block and jamb so that
the cross arm is on top of
the block.
4A
4B
4C
4D
4E