Installation Guide

10
D. Apply a 1/4" bead of sealant horizontally across
the top of the opening 1/2" from the face of the
glass blocks. This sealant line will be used to
secure the second half of the top channel.
E. Apply a 1/4" bead of sealant along the top inside
leg of the second half channel.
F. Slide the half channel into place between the
blocks and the top of the opening. If necessary,
temporarily apply a piece of tape to the channel to
hold it in place until the sealant sets.
G.Wait24hoursbeforenishingthejointstoallow
the sealant to cure.
Note: Please go to page 18 for joint nishing instructions
to complete your project.
5E
5D