Instructions / Assembly
Step 11:
Note:
Step 12:
Install (#20) Small Drawers into Workcenter
1). Pull out the side rails of the drawer bracket, all the
way to the front.
After pulling out each rail, make sure all the ball
bearings of the rail are visible and pointing
completely outward to the front.
2). Line up the inner rails on both the Small Drawer
Left Panel and Right Panel to the fully assembled
drawer, drag drawer with both hands and push the
drawer slowly at the same time to lock in place.
Repeat Step 11 for second drawer Installation.
Place Drawer Mat (#18) into Drawers
Pull out (#20) Small Drawers, place mat (#18) in
each drawer.
Pull the railing all
the way out.
10
Workcenter Island (Model No. UHD20109)
*NOTE: We recommend TWO people to assemble the workcenter.*










