Instructions / Assembly

Step 6:
Note:
Step 7:
Step 8:
Install (#6) Back-Bottom Crossbar
Attach (#6) Back-Bottom Crossbar to Back Legs, line up
the screw holes, use 4pcs (#50) Screw I (M6X15L) and 4pcs
(#59) M6 Lock Washer to tighten.
Install (#3) Bottom Shelf
Install (#5) Front-Bottom Crossbar
1. Please use TWO people for Bottom Shelf Installation
2. Do not fully tighten the screws.
3. Additional Bottom Shelf (#3) may be purchased
separately at SevilleClassics.com, Model#: UHD20109S,
to install at Pre-Drilled screw holes on each leg
indicated in the image, by simply removing those pre-
installed screws.
As shown in the picture, attach (#3) Bottom Shelf to 4
Legs, line up the screw holes, use 6pcs (#61) Screw O (M4 x
12L) to tighten, 2pcs for two Front Legs, 4pcs for two Back
Legs.
As shown in the picture, attach (#5) Front-Bottom Crossbar
on the back side of two Front Legs, line up the screw holes,
use 2pcs (#50) Screw I (M6X15L) and 2pcs (#59) M6 Lock
Washer to tighten. Use 2pcs (#61) Screw O (M4X12L)
tighten on the inner side of two Front Legs, then tighten all
screws including those in Step 6 at the same time.
Front
Back
Front
Back
Back
Front
8
Workcenter Island (Model No. UHD20109)
*NOTE: We recommend TWO people to assemble the workcenter.*
Used for
additional
Shelf.