Technical information

Installation Procedure
The installation of the SGC 500-watt mobile system involves
four separate areas:
Engine Compartment:
• Routing the DC cable from the engine compartment to
the equipment.
Installing the “Smart Solenoid”
• Connecting the DC power cable and starter switch.
Driver’s Compartment:
• Installing the control cable.
• Installing the Power Talk control head.
• Installing the SmartLock Pro.
• Installing the PowerTalk speaker.
• Installing the band-selector switch
Exterior:
Installing QMS with SG-235
• Connecting SG-500 to SG-235
• Installing Ground Strap.
• Installing antenna.
Rear Compartment:
Installing and interconnecting the SG-2000 transceiver.
• Installing and interconnecting the SmartPowerCube
amplifier.
(Installation will be facilitated with SGC’s Go Mobile kits: Cat.
No. 52-97 [with battery] or Cat. No. 52-98 [without battery].)
Engine Compartment
Lay out the DC cable lengthwise next to the vehicle to ensure
a generous and sufficient length to reach equipment that will
28
SGC Inc. SGC Building, 13737 S.E. 26th St. Bellevue, WA. 98005 USA
P.O.Box 3526, 98009 Fax: 425-746-6384 or 746-7173 Tel: 425- 746-6310 or 1-800-259 7331
E-mail: SGCMKTG@aol.com Website: http://www.sgcworld.com
© 1997 SGC Inc.
Chapter 6