1 Preliminary Work
Before implementing a formal deployment, the following preparations need to be completed:
1. Business cooperation process;
2. Statistics on the number and type of store ESLs;
3. Statistics on the installation mode of store ESLs (the type and quantity of guide rails
and clamps);
4. Location determination of the access point installation (focus on the network wiring);
5. Cloud deployment mode confirmation (SaaS or private cloud).
For the specific preparation process, please see implementation preparation collected in the
separate project documentation.
2 Product docking
It is necessary to start the docking of product information as soon as possible, after the
confirmation of business contract and the confirmation of product docking demand.
It takes about two weeks for product information docking.
The general process of product information docking is as follows:
1. SUNMI, the software partner shall discuss docking requirements and release technical
documents;
2. Confirm the docking plan and schedule the project;
3. Developing docking interface and launching after multiple environmental tests.
The deployment and implementation of equipment shall start after product docking.
See separate product docking documents for specific product docking procedures and
instructions.
3 Equipment Installation
3.1 Installation Preparation
Tools to be carried with during installation:
1. Rags, used to clean shelves
2. Big scissors or cutting machines for cutting guide rails
3. Electric drill for fixing equipment