Product Brochure

6
Align pipe with the tting, insert
pipe while rotating either pipe or
tting.
SharkBite 2XL PEX Stiffener
must be inserted into PEX pipe
prior to tting.
Connection is complete when
pipe is fully inserted with depth
insertion marked on pipe is still
visible at the head of the tting.
4
Rotate Shark Shifter De-
Mount Tool clockwise to
locate on lugs, rotate a
further 1/2" to disconnect.
Withdraw pipe from tting
then rotate Shark Shifter De-
Mount Tool anti-clockwise to
remove from tting.
Shark Shifter De-Mount
Tool to pipe just above the
connection then slide down to
engage lugs on the head of
the tting.
1
2
Cut COPPER, CPVC or PEX
using a quality Tuber or Pipe
Cutter with a sharp blade.
Make sure you have all
tools required.
Remove BURRS and ensure pipe
surface is free of scratches and
any debris. It is CRITICAL that
pipe be marked with the correct
insertion depth as listed below;
2
Quality engineering. Recessed release
collar guarantees NO accidental
disconnection; connection can only be
released with Shark Shifter Tool.
CONNECTION DISCONNECTION
CONNECTION AND DISCONNECTION
3 3
5
Shark Shifter
De-Mount Tool
1
1-1/4" Pipe Insertion Depth = 2"
1-1/2" Pipe Insertion Depth = 2-1/4"
2" Pipe Insertion Depth = 2-1/2"