Service manual

37
13VT-R100/R150
13VT-CR10
INSTALLING THE SHIFTER
Figure 1-42.
Capstan
D.D. motor
Drum
Reel pulley
(Bottom side of mechanism chassis)
Sifter
Phase-Matching
point 2
Insert
point 1
Half round notch
Shaft 1
Round mark
Loading gear (T)
Insert
point 3
Insert
point 2
Insert
point 4
Insert
point 6
Release
point 3
Shaft 1
Shaft 1
Shaft 2
1. Make sure that the loading gear is at the point 1 as
shown below.
2. Install, paying attention to 6 insertion points and 3
release points.
3. For the phase matching at the insertion point 1, see
the point 2 as shown below.
4. Finally fix the inserts 1 and 4.
Figure 1-43.
Rotation
point 2
Phase-matching
point 1