Operating instructions

TM 9-2320-209-10-1
d.
Power Discharging the Tank Sections.
FRAME 1
1.
Start engine. (Refer to para 4-6b.)
2.
Place truck in position to let discharge hose (1) reach filler hole of unit to be
serviced.
GO TO FRAME 2
4-131