Operating instructions

M 9-2320-209-10-1
FRAME 5
1.
Place boom chains (1) over truck bed and through lashing rings (2) on end of
truck bed.
2.
Double boom chains (1) back and place hook into chain about fifteen links from
lashing ring (2).
GO TO FRAME 6
4-295