Service manual

22
R-1855A
SCREW
DRIVER
MONITOR SWITCH
WHITE
BLACK
BLACK
PRIMARY INTERLOCK RELAY (RY2)
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. Disconnect two (2) wire leads from the male tab terminals of the Secondary Interlock Relay. Check
the state of the relay contacts using a ohmmeter. The relay contacts should be open. If the relay
contacts are closed, replace the circuit board entirely or the relay itself.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
TEST PROCEDURES
PROCEDURE
LETTER
COMPONENT TEST
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. Before performing this test, make sure that the primary interlock switch and the secondary interlock
relay are operating properly, according to the above Switch Test Procedure. Disconnect the wire
lead from the monitor switch (NC) terminal. Check the monitor switch operation by using the
ohmmeter as follows. When the door is open, the meter should indicate a closed circuit. When the
monitor switch actuator is pushed by a screw driver through the lower latch hole on the front plate
of the oven cavity with the door opened (in this condition the plunger of the monitor switch is pushed
in), the meter should indicate an open circuit. If improper operation is indicated, the switch may be
defective. After testing the monitor switch, reconnect the wire lead to the monitor switch (NC) terminal
and check the continuity of the monitor circuit.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all
functions.
G MONITOR SWITCH TEST
F
H DAMPER SWITCH TEST
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor
4. Disconnect the wire leads from the switch terminals and connect ohmmeter leads to the
common (COM.) and normally open (N.O.) terminals of the switch.
5. When switch actuator is pushed by the damper cam, the meter should be indicated a closed circuit.
6. When power cord is plugged into the wall receptacle, the damper motor operates and damper cam
will start to rotate. When the switch actuator is released, the meter should be indicated an open circuit.
If improper operation is indicated, replace the damper switch.
7. Reconnect all leads removed from components during testing.
8. Reinstall the outer case (cabinet).
9. Reconnect the power supply cord after the outer case is installed.
10.Run the oven and check all
functions.