Operation Manual

118
Employee report
• Sample X report • Sample Z report
Total labor cost
Overtime
Total hour
Total working time
per location
Total break time
per location
Edited time
Date
Break-out
Employee name
Job location name
Time-out
Break-in
Job location no.
Range
Employee code
Time-in operation
time
Operation
Total cost per
location
The subsequent printout occurs
in the same format as in the
sample X1 report.
~ER-A750(SEEG)-7 97.3.31 3:44 PM Page 118