Specifications

Table Of Contents
ENGLISH
DEUTSCH
FRANÇAIS
NEDERLANDS
РУССКИЙ
E-3
PARTS NAME
Louvers
(Air outlet of Plasmacluster Ion)
High density Plasmacluster Ion is discharged
forward. (Do not put anything in front of the unit.)
Plasmacluster Ion Generating Unit
(Inside)
Please open the cover only when replacing the
Plasmacluster Ion Generating Unit.
(See page E-9)
Filter (Air Intake)
* Clean the lter periodically.
* Do not block the air intake or do not put
anything into the unit.
Power cord
Plug
CONTROL PANEL
FILTER CLEAN Light
(yellow)
UNIT REPLACEMENT
Light
(red)
HIGH
MED
LOW
OPERATION Button
UNIT RESET Button
FILTER RESET Button
AUTO RESTART Switch
FIX THE OPERATION COVER BY SCREW
If necessary, operation cover can be xed by accessary screw.
washer
screw
rubber cover
After cleaning the lter, plug the power cord and
press the FILTER RESET button for 3 seconds.
Press this button for 3 seconds after replacing
the Plasmacluster Ion Gennerating Unit.
Don't press it for any other purposes.
Fan Speed
Indicator
(blue)
IG-A20EA40E.en.indd5IG-A20EA40E.en.indd5 2009/09/1713:39:032009/09/1713:39:03