Installation Manual

ENG. Version for UK Product
Revision Date : 6
th
March 2015
Energy Meter Install Guide for UK Wiring Diagram(2/3)
L
N
Load
RS485 Communication Line
Load Load
Generation
Meter
GRID
AIO PV
Utility
Meter
Energy
meter
C2000
Meter (C2000M)
Grid/All-in-One Connection
(1) Live In
L (Grid)
(2) Neutral In
N (Grid)
(3) Neutral Out
Load - N (All-in-One)
(4) Live Out
Load - L (All-in-One)
(5) No Use
-
(6) No Use
-
(7) TX +
RS485-A (All-in-One)
(8) TX -
RS485-B (All-in-One)