4. Operating Modes
4.2 Starting the System
1. After completing the installation, turn on the AC circuit breaker and the DC disconnect
switch installed in the distribution box (distribution board). (see the Section 5.7 in the
installation guide)
2. Check the system check message on the front LCD screen.
[Figure 4-36: Initial indication screen on power on]
3. After finishing the system check, check the system, the PV, and the battery status.
[Figure 4-37: Standby state indication screen before the EMS command]
4. You will receive the command from the EMS to convert to operation mode. For
individual operation mode screen, refer to 4.1.1~4.1.6.
5. If there is an event message received, refer to 4.1.7 and 7.2.
4.2.1 Turning off the System
To turn-off the system, push down the manual AC circuit breaker and DC disconnect switch
in the distribution board (panel board).
United Kingdom (Eng.) 05/2015. Rev1.1 25