Installation Manual RESU 10H SEG Type-R
3.1.4 Clearance
300mm
(12")
Floor
300mm
(12")
300mm
(12")
300mm
(12")
• Minimum clearances for the left,
right, top and bottom of the product
is shown in the gure for the proper
ventilation and installer convenience.
3.1.5 Tools & safety gears required
• Tools
The following tools are required to install the battery pack :
Installation
17
Precision screwdriver M6 Torque wrench Inclinometer
Drill
(Min. Diameter 10mm, 0.4")
Pencil or Marker