Installation Manual RESU 7H SEG Type-R

Turn o the inverter.
4.2
Put the battery pack in operation by taking the following steps :
Powering up the battery pack
4.3
To shut down the battery pack, follow these steps :
Shutting o the battery pack
1.
2. Remove the wiring box cover.
3.
5.
CAUTION
If it stays o, indicates FAULT or fails to operate, do not use the battery pack
and contact LG Chem (page 34) or your distributor.
Commissioning
28
Turn o the battery pack by moving the Circuit Breaker switch to the OFF
position.
Turn off the disconnect switch.
Close wiring box cover.
4.
WARNING
Do not turn off the disconnect switch at normal operation (Charge/
Discharge/Idle).
If not commissioning after installation or there is any fault on the battery
pack, turn off the Circuit Breaker, then turn off the disconnect switch.
1. Remove the wiring box cover.
2. Turn on the disconnect switch after installation battery pack. Make sure that
the Circuit Breaker switch is in the OFF position
(including Trip position)
3. Move the Circuit Breaker switch to the ON position.
4. Seconds after the Circuit Breaker switch is ON, 4 LEDs will be lit.
5. Make sure that ON indicator is on and see if the battery pack is successfully
initialized. The power on indicator on the front should turn on in green.
6. Close wiring box cover.
7. Turn on the inverter.