Installation Manual

3
TABLE OF CONTENTS
3
FOR INSTALLATION PERSONNEL .............................2
TABLE OF CONTENTS ................................................3
1 F
OR SAFE INSTALLATION WORK ....................4-9
1.1 C
autions regarding installation of
solar power systems ..............................................6
1.2 SRS Mounting System .......................................7-8
1.3 PV mo
dules ...........................................................8-9
2 POINT
S TO CHECK WHEN SELECTING THE
INSTALLATION LOCATION ................... 9- 12
2.1 Condition of house where solar power
system is to be installed ................................ 9-10
2.2 Checking the solar power system
installation location ......................................11-12
3 SPECIFIC
ATIONS ......................................... 13-14
3.1 Solar module and array specifications
modules: ND-167U1Y / ND-187U1 /
ND-187U1F ............................................................ 13
3.2 ND-167U1Y / ND-187U1 / ND-187U1F
module array layout dimensions ................... 14
4 PAR
TS .......................................................... 15-19
5 P
OINTS TO CHECK BEFORE INSTALLATION
WORK .......................................................... 19-2
0
6 INSTALLATION WORK ................................. 21-44
6.1 P
reparing shingle roof
for installation .......................................................21
6.2 Checking layout ...................................................22
6.3 Installing the optional flashings
....................23
6.4 Installing standar
d slider assembly ...............24
6.5 P
reparing tile roof installation ........................ 25
6.6 C
hecking layout ...................................................26
6.7 Installing tile slider assembly
....................27-30
6.8 S
ystem grounding ..............................................31
6.9 Installing mo
dule support rails ...................... 32
6.10 Installing fr
ont cover ..........................................33
6.11 Installing the mo
dules on
the SRS mounting system ..........................34-35
6.12 Installing t
op cover .......................................35-36
6.13 Installing side c
over ............................................36
6.14 C
onnecting the solar modules .................36-38
6.15 T
esting module strings for correct
voltage ....................................................................39
LIMITED
WARRANTY .................................Back cover